We analyze the economic competitiveness of grid-connected, distributed solar photovoltaic generation through small-scale rooftop installations in five Brazilian state-capitals. The locations represent a comprehensive set of the two essential parameters for the economic viability of PV—solar irradiation and local electricity tariffs. Levelized electricity costs (LEC) for PV generation and net present values (NPV) for a specific PV system are presented.

For over 16 years the Supreme Court has been hearing two major petitions concerning forests and wildlife. Writ petition 337/1995 filed by the Centre for Environmental Law (part of WWF) concerns protected areas (PAs) and writ petition 202/1995, is the omnibus forest petition widely known as the Godavarman case. The first landmark order in the second petition was delivered on December 12, 1996. In an unprecedented but hugely valuable effort, both the cases have been kept open under the writ of continuing mandamus.

This MoEF order dated May 2, 2011 has granted final approval to Orissa for diversion of 1,253 hectares of forest land for Posco's steel project. It says that the steel firm should not export raw material from the proposed project.

See Also

This article critically analyses the decision-making systems behind the proposed Pune metro rail system and its detailed project report, exposing several weaknesses in both. The decision-making system is seen to be ad hoc, and not sufficiently transparent or participative.

Subhash Narayan

The Union Cabinet is all set to bring clarity and finalise procedures for forestry clearance of projects that involve large-scale displacement of tribal population.

Rajat Guha

Even as a group of ministers is contemplating clubbing of all mining related-approvals in a single licence, the tribal affairs ministry is singing a different tune.

We undertook an economic valuation of mangrove forests in Balochistan province of Pakistan drawing on primary data from a survey of 80 households depending on mangrove forests. It was found that the direct value of mangroves was USD 1,287 per hectare, while the total value for the village was calculated to be USD 4,419,935.

There is a continuing tension between those who espouse growth and those who call for environment protection. The two groups do not talk to each other – they are talking at each other and with every passing day, the gap seems to be widening.

Itanagar: The Arunachal Pradesh government has said that they will soon realise an amount of Rs 241.36 crore as net present value (NPV) against two hydro-electric projects for diversion of forestland for non-forest use.

Chief Minister Dorjee Khandu said this while responding to a question raised in the Assembly by Congress legislator Tenzing Norbu Thongdok on Saturday.

He said, out of the to

14 mining leases were visited in five forest divisions (Satna, Balaghat, Bhandara, Kolhapur and Vadodara) spread across three states namely Madhya Pradesh, Maharashtra and Gujarat. The study included various minerals like Limestone, Bauxite, Ochre, Manganese, Fluorspar and Kyanite. (Out of 14 mining leases 3 were for underground mining and 11 were for opencast mining.)

 

Pages