Desilting proves costly
-
20/07/1998
The Punjab State Electricity Board has incurred power generation loss of Rs 6 crore following the desilting of the hydel channel. This was against the advide of the Chief Engineer, Canal, Punjab, who had insisted that the pond area should be cleared before taking work on the hydel channel so that generation could be improved in the UBDC power house.