Sethu project: global bids floated for dredging
Dredging work for about 75 km of the Sethusamudram Ship Channel will begin by November, the Union Shipping Minister, T.R. Baalu.Global bids have been floated and a period of 45 days has been given
Dredging work for about 75 km of the Sethusamudram Ship Channel will begin by November, the Union Shipping Minister, T.R. Baalu.Global bids have been floated and a period of 45 days has been given