downtoearth-subscribe

Hydropower projects: Wapda studies, engineering designs to complete soon

Water and Power Development Authority (Wapda) is vigorously carrying out feasibility studies and engineering designs of various hydropower projects with accumulative generation capacity of more than 25,000 MW and most of these studies are at the advance stage of their completion.