Draft EIA and Environment management plan for proposed GARE IV/6 coal mine project (OC and UG) of 4 MTPA in an area of 381.420 ha and coal washery 4 MTPA within ML area at village Gare, Lamdarha, Saraitola, Khamharia, Karwahi & Tehlirampur, Raigarh

Draft EIA and Environment management plan for proposed GARE IV/6 coal mine project (OC and UG) of 4 MTPA in an area of 381.420 ha and coal washery 4 MTPA within ML area at village Gare, Lamdarha, Saraitola, Khamharia, Karwahi & Tehlirampur, Raigarh

This document details the draft EIA and Environment management plan for proposed GARE IV/6 coal mine project (OC and UG) of 4 MTPA in an area of 381.420 ha and coal washery 4 MTPA within ML area at village Gare, Lamdarha, Saraitola, Khamharia, Karwahi & Tehlirampur, Raigarh.

Project Detail:

The Gare Palma(Pelma as per Toposheet) Coal Sub Block IV/6 was allotted jointly to M/s Jindal Steel & Power Limited, as leader, & M/s Nalwa Sponge Iron Limited by the Central Government vide Ministry of Coal’s (MOC) letter no. 13016/34/2005-CA-I dated 13-01-2006 for mining coal to meet the requirement of their respective Sponge Iron Plants situated at distances of 25 KM and 45 KM from the Coal Block at Taraimal & Raigarh, respectively.

Salient features of the project: